Typical BIM-solution projects
550 Bridge
Ø Project information:
Project name: Upgrading and expanding for DT743 (local road 743)
Category: Bridge part
Owner: Becamex IDC
Location: Binh Duong Province, Viet Nam
Scope: Total length of 203,4 meters, overall with 16 meters, 5 spans of composite steel and concrete structure
Ø Model phase:
Feasibility LOD 300
Detailed design LOD 400
Ø BIM model contens:
Substructures
Superstructures
Miscellaneous
Approach roadway
Lighting
Major construction method
Ø Products:
General view of the bridge
Top pier segment
Beams structure
Approach roadway
Miscellaneous
An Hoa InfrastructureØ Project information:
Project name: An Hoa Infrastructure
Category: Drainage and Roads
Owner: ThangAnh group
Location: Dong Nai Province, Viet Nam
Scope: 4ha areas
Ø Model phase:
Feasibility LOD 300
Detailed design LOD 400
Ø BIM model contens:
Drainage
Roads
Major construction method
Ø Products:
General view 1
General view 2
General plan
Cross section
Programming applications
Conflict detection
Running cars simulation